FAQ’s
i-Roof Q & A
We require a minimum of six weeks from call off to the installation day. This is due to the lead times of the dormers to ensure availability. If your property design doesn't incliude dormers, we may be able to decrease our six week lead time, speak to us to find out more.
The panelised solution offers a number of benefits to both yourselves as well as us. The health and safety risk is reduced, speed of build is increased, the product and materials are of a high quality, cost certainty, increased thermal protection, accuracy of build to the design drawing, the installation process is easier, reduced requirement of on-site labour and the lay down area that's needed on-site on the day of install is reduced.
Simply yes we do, to find out more information visit the Robust Detail website at www.robustdetails.com, alternatively please get in touch using the form at the bottom of the page.
We are able to offer a range of values to suit both current and future regulations and work closely with our clients to achieve a solution that suits their needs.
We understand things don't always go to plan and there's always a chance that an installation date may be missed. There's no need to worry, we will work with you to secure the next available date we have that also suits you and your build programme.
i-House Q & A
Our Contracts Managers offer full support throughout the process including after care once the installation has taken place. During the install, you will have a team of four operatives on-site, including a slinger signaller, crane supervisor and a fully competent crane operator.
As well as full support right from your initial enquiry through to after care and the team on-site throughout the installation, we also provide a crane on-site, two floors of floor cassettes, party wall insulation and of course the H+H element blocks.
Yes, our i-House and i-Roof solutions are fully compatible with each other, speeding up the build time even further.
When working with existing customers and their standard house types, we require six weeks. When we welcome a new customer on-board, it can take longer as we need to create their house type designs, however, once these are set up, six weeks is all we need.
Absolutely, both of our solutions are approved by both our in-house design team and an external structural engineer, so you can rest assured the solutions we install on your sites are of the highest quality and workmanship every time.
Ready to discuss your requirements
Simply fill in the form and one of our construction experts will get back to you within 48 hours.